PMS

Project Management System

PMS provides a systematic business management process that integrates work and information sharing between project teams,

and builds a unified project management environment that works for businesses of all sizes.

Through this, PMS supports efficient and optimized project management based on practice.

Individual progress and management by installation location in the large-scaleconstruction project

Management leak occurs

Absence of a real-time information sharing system

Inefficient operational Process

Lack of standard management processes for field work and installation work

Increased project risk

Lack of clear communication due to 

a separate line team and installation team

Project Delay

The need for a construction management system

PMS
One-stop-project-planning-and-scheduling-management.png

01

Establishing an optimized real-world project management process

02

Intuitive project scheduling based on the construction site

03

Real-time DB linkage and task status monitoring for each task

Process

The Most Efficient On-site Management Environment

STEP 1

Dedicated Account Login

STEP 2

Local list query

STEP 3

Fieldwork and Safety Work Plan

STEP 4

Fill in the installation information of line/AP

Features

Check the full site list

Check equipment and circuit construction/installation targets by searching the entire site list

Site information query

Search for construction targets by local name, region, and date

Search for work information (inspection, safety work plan, installation (equipment and lines)) within the relevant area

Real time monitoring

Check the status of tasks assigned to a specific location in real time through the site list

Site list query

Fill in the basic information required for the actual investigation

Providing basic information forms to prevent missing factual information

  • Name of the building where it will be installed, whether power is available, whether installation can proceed, information on the person in charge, etc.

Registering a real drawing

AP/PoE installation locations based on local demand list

After verification, register required real-world photos including drawing photos

Seamless real-world management

Preparation of safety work plan based on actual results

You can create a site plan using the safety work plan form.

  • Work process details, work safety, etc.

Create a risk assessment sheet

Various risk factors that may occur during work

Prepare a risk assessment table by studying in advance

On-site safety work plan

Enter line installation information

Register information about the completed cable line installation photos and locations

Enter AP installation information

After installing the AP based on the line installation information, register the corresponding photo and location information.

Link to line/AP information and photos

Linking of line/AP information and photos for efficient installation work information verification

Check the integrated information of the installation

Installation/Inspection Certificate

All DB connections including equipment within the local installation process

Create real-time reports

View and download the installation certificate whenever you need it

Electronic signature function

Installation confirmation with system electronic signature

Automatic signature stamp on printing

Check progress by process

Download progress for each process in Excel format to manage the process

  • Local list, equipment installation list, daily work list, etc.

Management functions