PMS
Project Management System
PMS provides a systematic business management process that integrates work and information sharing between project teams,
and builds a unified project management environment that works for businesses of all sizes.
Through this, PMS supports efficient and optimized project management based on practice.
Individual progress and management by installation location in the large-scaleconstruction project
Management leak occurs
Absence of a real-time information sharing system
Inefficient operational Process
Lack of standard management processes for field work and installation work
Increased project risk
Lack of clear communication due to
a separate line team and installation team
Project Delay
The need for a construction management system
Process
The Most Efficient On-site Management Environment
STEP 1
Dedicated Account Login
STEP 2
Local list query
STEP 3
Fieldwork and Safety Work Plan
STEP 4
Fill in the installation information of line/AP
Features
Check the full site list
Check equipment and circuit construction/installation targets by searching the entire site list
Site information query
Search for construction targets by local name, region, and date
Search for work information (inspection, safety work plan, installation (equipment and lines)) within the relevant area
Real time monitoring
Check the status of tasks assigned to a specific location in real time through the site list
Site list query
Fill in the basic information required for the actual investigation
Providing basic information forms to prevent missing factual information
-
Name of the building where it will be installed, whether power is available, whether installation can proceed, information on the person in charge, etc.
Registering a real drawing
AP/PoE installation locations based on local demand list
After verification, register required real-world photos including drawing photos
Seamless real-world management
Preparation of safety work plan based on actual results
You can create a site plan using the safety work plan form.
-
Work process details, work safety, etc.
Create a risk assessment sheet
Various risk factors that may occur during work
Prepare a risk assessment table by studying in advance
On-site safety work plan
Enter line installation information
Register information about the completed cable line installation photos and locations
Enter AP installation information
After installing the AP based on the line installation information, register the corresponding photo and location information.
Link to line/AP information and photos
Linking of line/AP information and photos for efficient installation work information verification
Check the integrated information of the installation
Installation/Inspection Certificate
All DB connections including equipment within the local installation process
Create real-time reports
View and download the installation certificate whenever you need it
Electronic signature function
Installation confirmation with system electronic signature
Automatic signature stamp on printing
Check progress by process
Download progress for each process in Excel format to manage the process
Local list, equipment installation list, daily work list, etc.